MIL-DTL-70438A(AR)
4.
VERIFICATION
TABLE I. Requirement/Verification Cross Reference Matrix.
Methods of Verification
Classes of Verification
A- First Article
N/A Not Applicable
B- Acceptance
1
Analysis
2
Demonstration
3
Examination
4
-
Test
Section 3
Description
Verification
Verification
Section 4
Requiremen
Method
Class
Verification
ts
N/A
123
4
A
B
3.1.1
First article
X
X
X
X
4.2
3.1.2
Conformance
X
X
X
X
4.3
3.2
Components and
X
X
X
X
4.3
assemblies
3.2.1
Plug, Universal
XX
X
X
4.3.2.1
3.2.2
Universal plug
XX
X
X
4.3.2.2
assembly (prior to
pouring alloy)
3.2.3
Universal plug
XX
X
X
4.3.2.3/4.4.2/
assembly (after
4.4.5
pouring alloy)
3.2.4
Ternary eutectic
XX
X
X
4.3.2.4/4.4.1
alloy
3.2.5
Adhesive
XX
X
X
4.3.2.5/4.4.4
3.3
Ammunition lot
X
X
X
4.3.1
numbering
3.4
Tension
X
X
X
4.3.2.1/
4.4.3.1
X
X
X
4.3.2.1/
3.5
Ductility
4.4.3.2
3.6
Fracture
X
X
X
4.3.2.1/
4.4.3.3
3.7
Workmanship
X
X
X
4.3.2.1/
4.3.2.3
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business