MIL-DTL-70507A (AR)
Drawing
number
Grenade assembly (prior to loading into projectile).
4.3.2.4
13001904,
13001906
Next higher
assembly
13001907
Conformance
Requirement
Classification
Examination or test
criteria
paragraph
Inspection
method
reference
112
Arming screw full
Level IV
3.3
Visual
thread visible
113
Arming screw free
Level IV
3.3
Manual
rotation
114
Slider housing
Level IV
3.3
AIE
clearance
115
Slider lock disturbed
Level IV
3.3
Visual
Minor
None defined
NOTES:
1/ Two samples per 1800 grenade assemblies produced on each machine. Accept on 0, reject on
1failure.
2/ Safety clip shall be removed immediately prior to grenade assembly insertion into
projectile.
3/ Examination shall be performed prior to slide lock being fitted onto fuze grenade
assembly.
13
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business