MIL-DTL-70507A (AR)
Drawing
number
Body loading assembly (after M223 fuze removal).
4.3.2.1
13001895,
13001896
Next higher
assembly
Conformance
Requirement
Classification
Examination or test
criteria
paragraph
Inspection
method
reference
Critical
None defined
Major
101
Lead cup assembly
100%
3.3
AIE
damaged, split,
cracked, missing or
improperly
assembled
102
Lead above flush or
Level IV
3.3
AIE
below max depth
103
Stud loose or free to
Level IV
3.3
AIE
rotate, after fuze
removal
104
Depth of drill
Level IV
3.3
AIE
105
Any body cracked,
Level IV
3.3
Visual
dented or distorted
after fuze removal
Minor
201
Evidence of poor
Level II
3.8
Visual
workmanship
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business