MIL-DTL-60377C (AR)
4.
VERIFICATION
TABLE II. Requirement/verification cross reference matrix
Methods of Verification
Classes of Verification
N/A Not Applicable
A- Design Verification
1 Analysis
B- First Article
2 Demonstration
C- Acceptance
3 Examination
4 - Test
Section 3
Description
Verification
Verification
Section 4
Requiremen
Method
Class
Verification
ts
N/
1234
A
B
C
A
3.1
First Article
XX
X
X
4.2
3.2
Components and
XX
X
X
4.3.2.1 thru
assemblies
4.3.2.7 or
4.3.2.8 as
applicable
3.2.1
Projectile loading
XX
X
X
4.3.2.1
assembly (prior to
loading explosive)
3.2.2
Projectile loading
XX
X
X
4.3.2.2
assembly (Before
post cycle
heating)(Radiograph
ic acceptance
requirements)
3.2.3
Projectile loading
XX
X
X
4.3.2.3
assembly (prior to
assembly of liner)
XX
X
X
4.3.2.4
3.2.4
Projectile, 155MM,
HE, M107 LAP (prior
to assembly of
supplementary
charge, if
applicable)
3.2.5
Projectile 155MM,
XX
X
X
4.3.2.5
HE, M107 LAP (prior
to assembly of
lifting plug)
3.2.6
Projectile, 155MM,
XX
X
X
4.3.2.6
HE, M107 Loading
Assembly and
Marking Diagram
3.2.7
Packing and marking
XX
X
X
4.3.2.7 as
for 155MM
applicable
projectile (metal
pallet)
11
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business