MIL-DTL-60585B (AR)
5. Packaging. For acquisition purposes, the packaging requirements shall be as specified
in the contract or order (see 6.2). When actual packaging of material is to be performed by DOD
personnel, these personnel need to contact the responsible packaging activity to ascertain
requisite packaging requirements. Packaging requirements are maintained by the Inventory
Control Point's packaging activity within the Military Department or Defense Agency, or within
the Military Department's System Command. Packaging data retrieval is available from the
managing Military Department or Defense Agency's automated packaging files, CD-ROM
products, or by contacting the responsible packaging activity.
6. NOTES.
(This section contains information of a general or explanatory nature that may be
helpful, but is not mandatory.)
6.1 Intended use. The components and assemblies covered by this specification are
intended for use on 155MM, WP, M110 Projectile. The M1E1 Projectile burster case covered by
this specification is military unique because it is used for 155MM howitzer ammunition only.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number and date of this specification.
b. Packaging requirements (see 5)
c. Requirements for submission of first article sample
d. Requirements for submission of zinc phosphate coating procedure (see 6.3).
e. Provisions for Government furnished material.
6.3 Zinc phosphate coating procedure. Details of the proposed procedure for zinc
phosphate coating to be used by the contractor should be submitted in writing to the Government
Technical Agency, and written approval should be received prior to initiation of production. The
proposed procedure should be in accordance with TT-C-490, and should include materials,
process and equipment to be used by the contractor, a detailed method of control including limits
for time, temperature, concentration and all other information pertinent to the process. Approval
of the process, materials or equipment implies no guarantee of acceptance of the results obtained
in use.
6.4 Stress relieved. When manufacturing the one piece design or alternative two piece
design (casing and sleeve), the burster casing should be stress relieved at a minimum temperature
of 700 degrees F. for a minimum of 30 minutes at temperature, following the final metal forming
operation and prior to assembly when using the two piece design.
19
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business